Granting of Occupancy Permit

The Office of the City Engineer issue an Occupancy Permit before any building or structure is used or occupied. It is secured after the completion of the structure. (Sec. 309 of the Code)

A Change of Use is also required if there is any change in the existing use or occupancy classification of a building, structure or any portion thereof. (Sec. 702 of the Code)

CHECKLIST OF REQUIREMENTS
Accomplished Application for Certificate of Occupancy (NBC Form B-11)
Accomplished Certificate of Completion (NBC Form No. B-10)
Logbook of building construction, signed and sealed by the Architect or Civil Engr. in-charge of construction.
For Change of Use: Accomplished Application for Change of Occupancy (NBC Form B-12)
Fire Safety Inspection Report (Please refer to service No. VIII. D.3. Issuance of Fire Safety Inspection Certificate)
As-built plan (as needed)